About

Alliance Scientific –

& Laboratory Casework Systems & Fume Hoods

Alliance Scientific Inc., headquartered in the greater Vancouver area, is a full-service provider of laboratory casework systems and fume hoods. Our target markets are universities, colleges, industry, research, healthcare, and schools.

Alliance Scientific is proud to announce that it’s a Tier One Lab Environments Strategic Alliance member. We are the exclusive Western Canadian dealers for the Bedcolab lines of steel laboratory casework and fume hoods and the CiF Lab Solutions lines of premium grade wood cabinets.

We are able to offer the complete spectrum of conventional, flexible and adaptable laboratory casework systems utilizing steel cabinets, steel cabinets with wood veneer fronts and AWMAC Premium Grade wood veneer furniture.

Selected Recent Projects

Project: University of Alberta – Electrical and Computer Engineering Research Facility (ECERF)
Architect: Dialog – Edmonton
Completion Date: 2018
Section:

12 53 35 Laboratory Casework
11 53 13 Fume Hoods

Project: McMaster University – Biomedical Engineering and Advanced Manufacturing (BEAM)
Architect: Diamond Schmitt Architects
Completion Date: 2018
Section:

12 35 53 Metal Laboratory Casework
11 53 13 Laboratory Fume Hoods

Project: University of Alberta – Augustana Laboratory Renewal, Camrose, Alberta
Architect: HFKS Architecture Inc. – Edmonton
Completion Date: 2018
Section:

12 35 00 Laboratory Furniture Systems

Project: University of Regina – Lab Building Modernization Phase II
Architect: P3A Architecture – Regina
Completion Date: 2017
Section:

11 53 13 Fume Hoods

Project: Simon Fraser University – SE3P
Architect: Bing Thom Architects – Vancouver
Architect: Research Facilities Design (RFD) – San Diego
Completion Date: 2019
Section:

11 53 10 Laboratory Casework and Other Furnishings
11 53 13 Fume Hoods and Other Air Containment Units
11 53 43 Laboratory Services Fittings and Fixtures

Project: University of Alberta – Chemical Materials Engineering Building (CME)
Renewal: Construction Levels L3, L2, L1, 1 and 8
Architect: Dialog – Edmonton
Completion Date: 2018
Section:

12 35 53 Laboratory Casework
11 53 13 Fume Hoods
11 53 43 Laboratory Fittings and Fixtures

Project: Vancouver Island University – Health and Science Centre
Architect: Perkins + Will – Vancouver
Completion Date: 2018
Section:

11 35 53 Flexible Laboratory System

Project: Royal Roads University, Victoria, BC – Centre for Environmental Sciences
Architect: HMAC Architecture + Design – Victoria
Completion Date: 2018
Section:

12 35 53.13 Steel Laboratory Furniture
11 53 13 Fume Hoods

Project: University of Alberta – Chemistry West South Levels 3, 4 and 5
Architect: HFKS Architecture Inc. – Edmonton
Completion Date: 2018
Section:

12 34 70 Laboratory Furniture Systems

Project: United Health Network, Toronto – MaRS Level 8 and TGH Fit-Out
Architect: Kasian Architecture Ontario Inc.
Completion Date: 2018
Section:

12 31 00.1 Flexible Open Benches
12 31 00.2 Fixed Closed Benches
12 31 00.3 Moveable Benches
12 31 00.4 Countertops

Project: PW&GSC – Alvin Hamilton Building, Regina, Saskatchewan
Architect: P3A Architects – Regina
Completion Date: 2018
Section:

12 35 53.13 Steel Laboratory Casework
23 38 16.13 Fume Hoods

Project: University of British Columbia – Hebb Building Upgrade
Architect: Acton Ostry Architects Inc. – Vancouver
Completion Date: 2019
Section:

11 53 10 Laboratory Casework and Other Furnishings
11 53 43 Laboratory Service Fittings and Fixtures

Project: Saskatoon Waste Water Treatment Plant Upgrade
Architect: City of Saskatoon
Completion Date: 2018
Section:

Steel Laboratory Casework

Project: Stanton Territorial Hospital Renewal Project – Yellowknife, NT
Architect: Kasian Architecture – Vancouver
Completion Date: 2018
Section:

12 30 00 Laboratory Casework